STRATEGIC PARTNERS – IMPLEMENTED PROJECTS
1. Project ANA MARINA – Nha Trang City, Khanh Hoa Province:
- Items: Importing + towing the ponton to the wharf + registering the wharf
- Contraction unit: ANA MARINA + MARINETEK
Ana Marina is the first marina in Vietnam, providing sheltered berthing for up to 220 yachts. Being built to not only provide needed infrastructure, facilities, and services for yachting business but also become a new attracting tourist destination, Ana Marina is one of the pioneers in the ultra-luxury tourism market in Vietnam.
- Project: ANA MARINA
- Location: Nguyen Co Thach Street, Nha Trang City, Khanh Hoa Province, Vietnam.
- Scale: 89 ha with 68 ha of water area
- Total investment: VND 390 billion
2. Trung Nam Ninh Thuan Solar Power Project – 204 MW:
- Item: Customs clearance – equipment transportation
- Contracting unit: TRUNG NAM GROUP
- Project name: TRUNG NAM SOLAR POWER PLANT
- Investor: Trung Nam Solar Power Joint Stock Company
- Scale:
– Capacity: 204 MW
– Maximum output power: about 450 million kWh/year
– Area: 264 ha
– Numbers of solar panels: more than 700.000 panels
-120° rotatable rack system, automatically rotating and adjusting direction to get solar radiation
- Location: Loi Hai Commune and Bac Phong commune, Thuan Bac District, Ninh Thuan Province.
- Commencement: 07/07/2018
- Inauguration: 27/04/2019
3. Trung Nam Tra Vinh Solar Power Project
- Item: Customs clearance – equipment transportation
- Contracting unit: TRUNG NAM GROUP
- Investor: Trungnam Tra Vinh Solar Power
- Scale:
– Capacity: 140 MWac
– Average output power: 250 million kWh/year
– Area: 171,17 ha
– Numbers of solar panels: more than 440.000 panels
– 120° rotatable rack system, automatically rotating and adjusting direction to get solar radiation
- Location: Dan Thanh Commune, Duyen Hai Town, Tra Vinh Province.
- Commencement: 19/01/2019
- Inauguration: 28/07/2019
4. Trung Nam Ninh Thuan Wind Power – 151,95 MW:
- Item: Customs clearance – equipment transportation
- Contracting unit: TRUNG NAM GROUP + ENERCON
- Project name: TRUNG NAM WIND POWER PLANT
- Investor: Trung Nam Wind Power Joint Stock Company
- Scale:
– Capacity: 151,95 MW, to be divided in to 02 phases.
– Phase 1: 39,95 MW (17 turbine, 2,35 MW)
– Phase 2: 64 MW (16 turbine, 4 MW)
– Phase 3: 48 MW (12 turbine, 4 MW)
- Location: Thuận Loi Hai Commune and Bac Phong Commune, Thuan Bac District, Ninh Thuan Province
- Commencement: 26/8/2016
- Inauguration phase 1: 16/4/2019
5. Trung Nam Thuan Nam Solar Power Project – 450 MW:
- Item: Customs clearance – equipment transportation
- Contracting unit: TRUNG NAM GROUP + A CHAU INDUSTRIAL JOINT STOCK COMPANY (ACIT)
- Project name: TRUNG NAM THUAN NAM SOLAR POWER PROJECT
- Investor: Trung Nam Wind Power Joint Stock Company
- Total investment: VND 000 billion
- Scale:
– Area: 557,09ha
– Quantity of leveling stones: more than 3 million m3
– Quantity of steel: 30.520 tons
– Numbers of solar panels: 1.4 million panels
- Location: From Phuoc Minh Commune, Thuan Nam District, Ninh Thuan Province to Vinh Tan Commune, Tuy Phong District, Binh Thuan Province
- Commencement: 15/05/2020
- Inauguration: 12/10/2020
6. Bau Zon Solar Power Project – 50 MW:
– Item: Customs clearance – equipment transportation – emptying containers
– Contracting unit: A CHAU INDUSTRIAL JOINT STOCK COMPANY
- Project name: BAU ZON SOLAR POWER PROJECT
- Investor: A Chau Industrial Joint Stock Company
- Total investment: VND 500 billion
- Scale:
– Total capacity: 25,031 MWp
– Area: 29 ha
- Location: Phuoc Huu Commune, Ninh Phuoc District, Ninh Thuan Province
- Official opening date: 05/8/2020
7.Ca Na – Ninh Thuan General seaport Project (Phase 1):
- Item: construction of wharf structure 1A
- Contracting unit: TRUNG NAM SMC
- Project name: CA NA – NINH THUAN GENERAL SEAPORT PROJECT
- Investor: Trung Nam Wind Power Joint Stoct Company
- Total investment: VND 463 billion
- Scale:
– Area: 108 ha
– The main functional subdivisions include 02 port of 70.000 – 100.000 DWT; 01 port of 20.000 DWT, a warehouse, and service infrastructure.
– Design capacity of ported cargo: 3.3 million ton/year
- Location: Ca Na beach, to the west of mui Sung Trau, Phuoc Diem Commune, Thuan Nam District, Ninh Thuan Province.
- Groundbreaking ceremony: 25/8/2020
8. Wind Power No.5 – Phuoc Huu – 50MW :
– Item: Customs clearance – equipment transportation
– Contracting unit: TRUNG NAM GROUP – ENERCON
- Project name: WIND POWER NO.5 – PHUOC HUU – 50MW
- Scale:
– Total capacity: 46.2 MW
– Number of turbines: 11 (4.2 MW/pillar)
– Estimated output: 136,281 MWh/year
– Project of direct connection to the national power grid with a voltage of 220 kV through a 220 kV line 1,502 km long connecting from 220 kV transformer station of Wind Power Plant No. 5 to Ninh Phuoc 220 kV substation
– Substation with 01 3-phase transformers with capacity of 50MVA
- Location: Phuoc Huu Commune, Ninh Phuoc District, Ninh Thuan Province.
9. Ea Nam Wind Power – EaHleo – 400MW:
- Item:
- Customs clearance – transportation – erection of 500KV substation – installation of wind turbines.
- Supply manpower to undertake the project construction team to install wind power poles.
- Providing equipment for the projects:
- Equipment for forklift weighing 5 tons, 7 tons.
- Tire crane from 25 tons to 350 tons.
- Contracting unit: TRUNG NAM GROUP – TRUNG NAM SMC – ACIT– ENERCON
- Project name: EA NAM WIND POWER – EA H’LEO – 400MW
- Investor: Trung Nam Wind Power Joint Stock Company
- Scale:
– Total capacity: 400 MW
– The finished project will provide 1.1 billion kWh/year to the national electricity source
– With more than 4000 employees worked continuously for 240 days and nights.
- Location: Ea Nam Commune, Ea H’leo District, Dak Lak Province.
- Commencement: 02/6/2021
- Connect to the national power grid: 06/11/2021
10. Che Bien Mien Nui Wind Power Plant + Che Bien Tay Nguyen Wind Power Plant – 100MW :
- Item: Customs clearance + Transhipment of equiment – installtion of Envision turbines
Providing equipment for the project:
- Forklift from 3 tons to 5 tons.
- Crane tires from 50 tons to 500 tons.
- Crawler cranes from 80 tons, 100 tons, 250 tons to 800 tons.
- Bucket wheel loader 3.2m3 to 5m3 .
- Tractor wind turbine, trailer.
- Contracting unit: SINOHYDRO (JOINT VENTURE CONTRACTOR THANH DO – ANH KIET – CAM RANH) – TRANSIMEX
- Project name: PHAT TRIEN MIEN NUI WIND POWER PLANT + CHE BIEN TAY NGUYEN WIND POWER PLANT – 100MW
- Investor: Chu Prong Wind Power Joint Stock Company and Chu Prong Wind Energy Joint Stock Company
- Total investment: VND 3,600 billion
- Scale:
– Total capacity: 100 MW
– Total power output: 319.5 million kW/year
- Location: Bau Can Town, Chu Prong County, South Central Gia Lai Province.
- Expected to connect to the grid: 2022
11. Huong Linh Wind Power 7-8 – 50MW :
- Item: Customs Clearance – equipment transportation
- Contracting unit: ENERCON
- Project name: HUONG LINH WIND POWER 7-8-50MW
- Huong Linh Wind Power 7:
- Project name: HUONG LINH WIND POWER 7
- Investor: Huong Linh 7 Wind Power Joint Stock Company
- Total investment: VND 1,183 billion
- Scale:
– Total capacity: 30 MW
– Area: 15.11 ha
– Provide an average amount of electricity of 100,710 MWh/year
- Location: Huong Linh Commune, Huong Hoa District, Quang Tri Province.
2.Huong Linh Wind Power 8
- Total investment: VND 975 billion
- Scale:
– Consists of 6 wind turbines, each with a capacity of 4.5 MW
– Area: 16.031 ha
– Provide an average amount of electricity of 83,692 MWh/year
- Location: Huong Linh Commune, Huong Hoa District, Quang Tri Province
12. GELEX 1-2-3 WIND POWER– 150MW :
- Item: Customs clearance – equipment transportation
- Contracting unit: ENERCON
- Project name: GELEX 1-2-3 WIND POWER -150MW
- Invester: Quang Tri Gelex Energy Joint Stock Company
Scale:
– Gelex factory1: 30 MW
– Gelex factory 2: 30 MW
– Gelex factory 3: 30 MW
Total investment:
– Gelex factory1: VND 1343 billion
– Gelex factory 2: VND 1357 billion
– Gelex factory 3: VND 1357 billion
Accredited for commercial operation in October 2021.
- Location: Huong Linh Commune, Huong Hoa District, Quang Tri Province.
13. Ham Cuong Wind Power 2 – 20 MW:
- Item: Customs clearance – equipment transportion
- Contracting unit: ENERCON
- Project name: HAM CUONG WIND POWER 2 – 20MW
- Investor: HD Investment Joint Stock Company
- Total investment: VND 900 billion
- Total capacity: 19,8 MW
- Location: Tien Thanh Commune, Phan Thiet City, Binh Thuan Province.
14. Tra Vinh Dong Hai Wind Power 1 V1-7:
- Item:
- Siemens Gamesa tuabin turbine installation.
- Providing equipment, and manpower for the project:
- Crawler crane 100 tons, 800 tons.
- Transport barges with capacities of 13000 tons and 8000 tons.
- Wind power poles installation team.
- Contracting unit: TRUNG NAM SMC
- Project name: TRA VINH DONG HAI WIND POWER 1 V1 -7
- Total investment: VND 5000 billion
- Scale:
- Consists of 25 wind turbines, each with a capacity of 4 MW
- Total capacity: 100 MW
- Provide an average amount of electricity of 330 million MWh/year
- Location: Sea V1-7, Dong Hai commune, Duyen Hai district, Tra Vinh province.
15. Lac Hoa Wind Power – phase 1 – 30MW:
- Item: Transport 110KV substation.
- Contracting unit: A CHAU INDUSTRIAL JOINT STOCK COMPANY
- Project name: LAC HOA WIND POWER – PHRASE 1 – 30MW
- Total investment: VND 1.450 billion
- Scale:
– Total capacity: 30 MW
– Consists of 6 turbines with a capacity of 3.8MW and 2 turbines with a capacity of 3.6MW
– The electricity output put on the national grid is expected to be about 90 million kWh/year.
- Location: Lac Hoa commune, Vinh Chau district, Soc Trang province.
- Commencement: 31/12/2019
- Inauguration: 08/04/2022
16. Wind Power V1-2 Tra Vinh – 48MW:
– Item: Transport 110KV substation.
– Contracting unit: A CHAU INDUSTRIAL JOINT STOCK COMPANY
- Project name: WIND POWER V1 – 2 TRA VINH – 48MW
- Total investment: VND 2.232 billion
- Scale:
– Total capacity: 48 MW
– Consists of 12 turbines
– Area: 29 ha
– Power output reaches 168 million kWh/year
- Location: Truong Long Hoa commune, Duyen Hai district, Tra Vinh province.
18. Vien An Ca Mau Wind Power Project – 50MW:
- Item: Customs clearance for importing Ming Yang turbines
- Contracting unit: INFINITY LOGISTICS
- Project name: VIEN AN CA MAU WIND POWER PROJECT – 50 MW
- Total investment: VND 2.400 billion
- Scale:
– Total capacity: 50 MW
– Including 16 wind turbines, building 35kV transmission line to collect turbines’ capacity to 35/110kV station.
– Area: 13.6 hectares on land (249.3 hectares on water surface)
– Estimated output: about 172.83Gwh/year.
- Location: Ngoc Hien district, Ca Mau province.
- Completion date: 30/10/2021.
19. Project District 9, Ho Chi Minh City
- Work items: Providing cranes for the construction and erection of steel structures.
- Providing equipment for the project:
- Equipment for forklifts weighing 5 tons, 7 tons.
- Crawler crane from 25 tons to 350 tons.
- Construction year: From 2015 – 2017.
- Location: Hi-tech Park, Tang Nhon Phu B ward, District 9, Ho Chi Minh City.


20. JongJin metallurgy Factory, Long Giang Industrial Park – Tien Giang
- Work items: Installation of machinery and equipment in the factory, installation of conveyor belts and factory structure.
- Providing equipment for the project:
- Forklift 10 tons, 15 tons.
- Crane truck 5 tons, 8 tons, 10 tons.
- Specialized crane truck weighing 25 tons, 50 tons and 80 tons.
- Location: Long Giang Industrial Park – Tien Giang
- Contruction year:
OTHER PARTNERS THAT NECECONS HAS PROVIDED OR CO-PROVIDED WITH ANOTHER THIRD PARTY